Sequence from the raw ceiling to the completion of the floor structure:

Processing of ThermoWhite WD products on the construction site

Here, the installation by means of the ThermoWhite System MixMobile is shown. In principle, installation with the ThermoWhite ready-to-use products in the 100 and 200 liter bags works in the same way.

  • construction site rough installation on the rough ceiling

    Completed installation work before laying ThermoWhite thermal and impact sound insulation.

  • installation of thermowhirte on the installations on the raw ceiling

    After completion of the laying work, the ThermoWhite insulation fill is installed. The material is compacted and drawn down to the intended level according to plan.

  • thermowhite ready installed and compacted

    During installation, the installation lines are seamlessly wrapped by ThermoWhite and thus insulated.

  • installation of underfloor heating over thermowhite thermal and impact sound insulation

    After the drying time, foils or panels can be laid on ThermoWhite. If necessary, the underfloor heating can be laid afterwards.

  • flowing screed poured over the heating installation

    The next step is the laying of the screed (in this example, flowing screed). The screed is also laid to the desired level according to the plan.

  • floor (parquet floor) installed after installation of thermowhite impact sound and thermal insulation

    Finally, the desired floor is installed on the screed.